Tag: Rt 2A Crossing

Phase 2A Status: Still Tying Up Loose Ends

It has been one step back and two steps forward for the Phase 2A design. The step back, a realignment of the Rt. 2A (Great Road) bridge, is an interesting one that we believe will be worth the wait. The

Tagged with: , ,
Top