  1. We have reviewed the four options for the BFRT crossing of Route 2 including:
    1. BFRT Over Route 2 in the vicinity of the existing railroad right of way
    2. BFRT Under Route 2 in the vicinity of the existing railroad right of way
    3. BFRT running along the proposed relocated Commonwealth Avenue bridge over Route 2 and along the north side of Route 2 and over Nashoba Brook before connecting into the existing railroad right of way
    4. BFRT running along the proposed relocated Commonwealth Avenue bridge over Route 2 and along Route 2A to Wetherbee Street before connecting into the existing railroad right of way
  2. BFRT running along the proposed relocated Commonwealth Avenue bridge over Route 2 and along the north side of Route 2 would require an additional bridge crossing of Nashoba Brook and additional wetland impact. BFRT running along Rte 2A would require additional right of way and wetland impacts. These two options have been dropped from further consideration because of the additional wetland and right of way impacts but will be included in the evaluation as part of the Environmental Impact Report.
  3. Both the BFRT over and under Route 2 options have been advanced to the 10% level at this time and are proof of concepts only. Once a decision has been made as to which is the preferred crossing alternative, the design will be further refined. Cost estimates are not developed at this time.
  4. The option of going over Route 2 has the least impact to Route 2 itself. Route 2 is in a dip at this point and would remain so as the trail goes up and over Route 2 and Nashoba Brook at this location. The fill slopes at each end of the bridge would be between 450 and 500 feet long at 4.5% profile slopes, with the bridge itself being between 400' and 450' long.
  5. The option of going under Route 2 will be almost hidden from Route 2 and Route 2 will be screened from the trail. The approaches to the tunnel will generally follow the existing ground and Route 2 would be raised in this area. The tunnel would be between 16' and 20' wide with a height of between 10' and 12'. This option would utilize a reconstructed railroad bridge over Nashoba Brook.

Contact Grace Arthur if you have questions or comments.

Grace Arthur, Project Manager
Massachusetts Highway Department
617-973-8251
Grace.Arthur@mhd.state.ma.us

Additional information about the Route 2 Rotary project is available on here
http://www.route2concordrotary.com/

Rotary Detail Map

The orange outline indicates the limits of the Rt. 2 Rotary reconstruction.